Wednesday 14 June 2023

Upper floor bricks


Just a quick update. Today saw the loading of our upper floor with bricks ready for the next phase of brickwork. We did have a brick delivery two days ago but it was only a small load and left stacked on verge. Today's load went straight onto top slab, along with moving the first load up there.

The upper floor will bring our three main bedrooms, our master ensuite and robe, the kids bathroom, our sitting room, a study nook and it balcony. Hopefully we get some good news about the brick layers soon.

15/6: We had some door frames delivered today :)